How We Deliver

Hardware that drops into the system you already run.

Site survey and integration work on a read point

Where projects stall

The read rate looks fine on paper.

A layout is signed off from a drawing of the site, and the first real pallet behaves differently from the sketch. The read points are surveyed before the order, with your goods, so the layout is set for the metal, the liquid and the traffic that are actually there.

Why it is hardRead range has no single published number, because it is a link budget rather than a specification. The power that reaches a tag depends on reader transmit power, cable loss, antenna gain and beamwidth, propagation loss, the polarization match and the physical orientation of the tag, and the chip's own sensitivity. Change the pallet, the racking or the goods and every term in that budget changes with it - which is why a layout drawn on a plan is a hypothesis, not a result.

Our partThat is why the read points are surveyed before the order, with your goods, on your site. Where the goods are metal or liquid, or the doorway is tight, the antenna choice is what does the work - the JNA series and the antenna range we carry exist to cover that spread of geometry.

The readers work; the system still waits.

Hardware arrives with a manual and the interface is left to the buyer, so a fortnight of reading turns into a month of software. The data contract is agreed before installation, and the reader joins the network as a device rather than a project of its own.

Why it is hardThe integration risk in an RFID project is almost never the radio; it is the data contract. A reader is a device on the network that produces events, and the project slips when the shape of those events is decided after the hardware lands. Agreeing the contract first turns the reader into a device that joins the network rather than a project of its own.

Our partOur readers expose a documented API and SDK, and we work with your integrator on the interface so the record stays in the system you already run.

Commissioning is where the schedule goes.

Acceptance criteria are settled late, and the argument at the end is about what counts as done. The acceptance test is written before installation, so the sign-off is a measurement rather than a meeting.

Why it is hardIf acceptance criteria are settled at the end, the last conversation is about what counts as done rather than whether it is done. Written before installation, acceptance becomes a measurement against a number both sides agreed while the design was still open.

Our partWe write the acceptance test with you before installation, and the configuration, the read-point map and the parts list are handed over with the equipment.

What we deliver

Survey and antenna selection

A site walk, a read-point layout and a test with your goods before the order is placed.

Integration with the systems you run

WMS, ERP and MES. The readers expose a documented API and SDK, and we work with your integrator on the interface.

Interfaces and protocols

The readers expose a documented API and SDK over the network interfaces the site already uses, and the data contract is agreed before installation.

Commissioning and acceptance

A read-rate test on your goods, at your read points, against the criteria agreed at the start.

Spares and support

The parts list handed over with the equipment, and a route back to us when something needs replacing.

How we set a read point

The single most useful thing to know about UHF RFID is that read range is not a number on a datasheet - it is the outcome of a link budget. Power has to reach the tag and a much weaker reply has to survive the trip back, and both depend on the geometry of a particular doorway, a particular pallet and a particular product. That is why a read point is designed against the site rather than specified from a catalogue, and why the survey comes before the order rather than after the first disappointing test.

  • Read range is a link budget, not one number
  • Polarization and orientation decide the zone
  • Acceptance is measured, not negotiated

We supply the survey, the readers, the antennas and the commission, and we hand over the read-point map and the parts list with the equipment.

Where the hardware sits

JNR-E401N

Fixed readers and antennas

The zone layer: conveyors, dock doors, production lines and large read areas.

JNR-E401N · JNR-E801N · JNA series UHF antennas

View the JNR-E family
JNC-DW07

Gateways

The doorway and lane layer: read a pallet or a carton as it passes.

JNC-DW07 · JND-C09W · JND-E09A · JNR-DG08

View the RFID portal range
JNR-DSE03

Desktop readers

The desk layer: item-level check-in, issue counters and verification.

JNR-DSE01 · JNR-DSE03 · JNR-DSE06

View the JNR-DSE family
JMDS65

Handhelds and tablets

The aisle layer: stock-takes, rounds and exceptions where the fixed points stop.

JMDS65 · JMDT80

View JMDS65

What hardware does this industry usually deploy?

A working configuration for this industry, taken from the equipment listed above. The band column gives the UHF RFID standards the hardware is built to.

Role on siteRecommended modelsUHF bandWhat it does
Fixed readers and antennasJNR-E401N · JNR-E801N · JNA series UHF antennas902-928 MHz (US) / 865-868 MHz (EU)The zone layer: conveyors, dock doors, production lines and large read areas.
GatewaysJNC-DW07 · JND-C09W · JND-E09A · JNR-DG08902-928 MHz (US) / 865-868 MHz (EU)The doorway and lane layer: read a pallet or a carton as it passes.
Desktop readersJNR-DSE01 · JNR-DSE03 · JNR-DSE06902-928 MHz (US) / 865-868 MHz (EU)The desk layer: item-level check-in, issue counters and verification.
Handhelds and tabletsJMDS65 · JMDT80902-928 MHz (US) / 865-868 MHz (EU)The aisle layer: stock-takes, rounds and exceptions where the fixed points stop.

How a project runs

  1. Survey We walk the site, agree the read points and test the goods where they will actually be read.
  2. Integrate The interface is agreed, the reader is configured, and it joins the network you already run.
  3. Commission and hand over Acceptance is measured against the agreed test, and the documentation and parts list are handed over with it.

Questions we get

Do we have to change our WMS or ERP?
No. The readers expose a documented API and SDK, and we work with your integrator on the interface. The record stays where it is today.
Who carries out the integration?
Your integrator or ours. We agree the data contract and the acceptance test with whoever holds the system.
What happens after handover?
The configuration, the read-point map and the parts list go with the equipment, and spares stay available as items rather than as a service contract.

Tell us about the site.

Send the process, the goods and the system you already run, and we will come back with a read-point layout and an integration plan.

Email support@jnxrfid.com

Related industries: Supply chain & logistics · Manufacturing & industrial tooling · Healthcare & hospital SPD · Apparel & fashion retail · New energy & utilities · Banking & archives · Public sector & public assets · Aviation MRO & ground support · Anti-counterfeiting & traceability

Contact: support@jnxrfid.com · All industry solutions

Evaluation Unit